UNI — a community of architects & designers
Where ideas graduate.
Publish your work, trade critique with designers worldwide, and compete in challenges that put it in front of juries.
Below: the latest work from the community, updating daily.
Art Wave: Terracing a Sunken Lake in Sudan into Rings of Landscape and Architecture
Rooms, labs and green-roofed houses trace the site's contour lines down to an oval lake, folding building and landscape into one continuous gesture.
Symbiotecture: A Geological Park Where the Quarry Stays the Main Event
A slim bar on the rim and a stair of glazed laboratories descend into a terraced red quarry in Sudan, lit at night by paths of light.
Intermind: Slime Mold Logic and Instagram Data Grow a Virtual Canopy Over Melbourne's Centre
Lei Wu turns Instagram posts into virtual greenery, letting a slime mold's foraging network decide where walkways and data foliage should grow.
Anganwadi: A Rural Health and Learning Centre Built from Perforated Brick, Courtyards and Trees
Mohd Musa's shortlisted Grassroots entry gives children and expectant mothers in India a brick centre where courtyards and trees do the teaching.
Hello, I have a question about Category 1 (Façade Systems & Architectural Skins). The brief asks for the system to be demonstrated on an 8 m × 18 m surface. On Via Brera, the ground floors are mostly shopfronts and entrances. Would it be acceptable for the 8 × 18 m demonstration skin to start above the ground floor (i.e. covering the upper floors only), leaving the commercial ground level free, as long as the full 8 × 18 m surface and the 1.2 × 1.2 m module are respected? In other words, does the 18 m height have to start at street level, or can it be positioned on the building elevation where the façade system is relevant? Thank you for your clarification.
Good question, and the answer is yes. The 8 m x 18 m is a demonstration surface for your system, not a survey of one specific elevation on Via Brera. The brief asks for a reusable skin rather than a fixed elevation, one that adapts across varying building heights and programmatic conditions, so where you position it is your decision. The 18 m does not have to begin at street level. Leaving the commercial ground floor free is a sound reading of that context, and it can work in your favour. How your system terminates where it meets the shopfronts is exactly the kind of programmatic condition the brief has in mind, so show that junction rather than cropping it out of the drawing. Two things to keep intact: the 1.2 m x 1.2 m module, and the dense to open transition reading clearly across the full 18 m wherever you place it.