UNI — a community of architects & designers
Where ideas graduate.
Publish your work, trade critique with designers worldwide, and compete in challenges that put it in front of juries.
Below: the latest work from the community, updating daily.
EV Showroom Architecture: NIO House Hefei Xinqiao Industrial Park by SHL
The article explores the innovative EV showroom architecture of NIO House Hefei Xinqiao Industrial Park, designed by SHL, merging sustainability and customer experience.
Agnews K12 Campus LPA Architecture: A Next-Generation Educational Environment
Agnews K12 Campus by LPA unites three schools on a sustainable 55-acre site, blending collaborative learning, nature, and innovative design.
A Reversible River Pavilion for Everyday Public Life
REED NEST is a single-storey, approximately 200 m² civic pavilion on the Yongding River waterfront in Beijing. It is placed in the linear green belt between the embankment-top road and the riverside patrol platform, keeping the flood-conveyance area unobstructed. The site is read as a changing threshold between the river, seasonal wetland, public paths,.
Hello, I have a question about Category 1 (Façade Systems & Architectural Skins). The brief asks for the system to be demonstrated on an 8 m × 18 m surface. On Via Brera, the ground floors are mostly shopfronts and entrances. Would it be acceptable for the 8 × 18 m demonstration skin to start above the ground floor (i.e. covering the upper floors only), leaving the commercial ground level free, as long as the full 8 × 18 m surface and the 1.2 × 1.2 m module are respected? In other words, does the 18 m height have to start at street level, or can it be positioned on the building elevation where the façade system is relevant? Thank you for your clarification.
Good question, and the answer is yes. The 8 m x 18 m is a demonstration surface for your system, not a survey of one specific elevation on Via Brera. The brief asks for a reusable skin rather than a fixed elevation, one that adapts across varying building heights and programmatic conditions, so where you position it is your decision. The 18 m does not have to begin at street level. Leaving the commercial ground floor free is a sound reading of that context, and it can work in your favour. How your system terminates where it meets the shopfronts is exactly the kind of programmatic condition the brief has in mind, so show that junction rather than cropping it out of the drawing. Two things to keep intact: the 1.2 m x 1.2 m module, and the dense to open transition reading clearly across the full 18 m wherever you place it.