Oasis Ikemeleng
An ubuntu oasis in the midst of exploitation and hazard.
Sign in to view this project
Create a free account or log in to access project galleries and media.
Sign InExplore Living Building Competitions
Discover active competitions in this discipline
Hosted by Beegraphy
From Logic to Configurators
Prize Pool:USD 7,000
Workshop Series: November 30, 2026
Registration ends: December 20, 2026
Worldwide
Hosted by UNI
Bring back Drive In's
Prize Pool:USD 7,000
Regular registration ends: November 30, 2026
Submission ends: December 1, 2026
Riyadh, Saudi Arabia
Hosted by UNI
Design challenge to reuse E-waste
Prize Pool:USD 7,000
Regular registration ends: October 30, 2026
Submission ends: November 1, 2026
Worldwide
Similar Projects
Discover related projects you might like
Comments (2)
Please login or sign up to add comments
Generating a design narrative within the interpretations and understandings of ubuntu is a striking starting point. However, the various scenarios of ubuntu could be discovered with inspirational spaces for individuals and for the community. The proposed spatial organization based on repetitive units monotonously arousing on the site creates a rigid scheme that limits a potentially diverse living environment for the future residents. The urban template does not develop and intertwined relationship with the context and lacks scalable or adaptable solution for future necessities. The use of baobab within the project is very representational were as it could have been performatively employed to create an active community live and ecologic restoration that is triggered by the symbolic power of these trees.
The idea of building an entire community revolving around ubuntu carries a great potential in the overall scheme of the project narrative. Nonetheless, the graphic characterization does not display nor explore the inspiring narratives of ubuntu. The overall system and spatial organization are not part of a flowing/entangled framework that will allow a performative use of the designed spaces, nor it accommodates the necessary uncertainty that will follow the future of the project.