Concept - Breaking Work
New ways of working - dynamic
The concept for this new way of working is proposed as interconnected spaces, a fluidity in the way of working not only in the work itself but also in the architectural form and the arrangement of the booths, a series of modular booths are available. which move through a series of ramps where the intention is to have an uninterrupted connection throughout the environment and achieve a space with attractive visuals, in turn this coworking space is connected by means of a ramp which reaches the level 2 where the work arrangement is in a more conventional way, adapting closed glass booth spaces to maintain privacy if someone who is working in the open plan area needs a closed space to talk to clients or isolate themselves. The rest of the program takes place on level 1 where it is the pedestrian entrance where you reach a reception and behind this is the administrative area, the offices on this floor are designed to be able to expand if necessary and increase the square footage by means of of sliding walls, on the ground floor level is the dining room, kitchen and lounge area and on level -1 the parking area and warehouses as well as the machine room.
Popular Articles
Popular articles from the community
Tenter Studio Steps a Valle de Bravo Holiday House Down a Slope Around a Void Built for Pausing
In Valle de Bravo, Mexico, two dark brick volumes descend a steep plot and frame a deliberate gap, keeping the landscape quiet rather than staged.
Studio Andre Lenza Shrinks a Family Home into a Single-Storey Goiânia House Behind Timber Screens
A couple's move to a smaller home in eastern Goiânia becomes a single-storey concrete house wrapped in timber screens, around a plunge pool and garden.
David Macias Steps a Doorless Stone and Plaster House Down a Tropical Colombian Hillside
In the humid hills of Colombia, Threshold House replaces the front door with an open void and terraces its 850 m² down the slope instead of fighting it.
U.GA Architects Wraps an Oval Rooftop Pool in Curved Board-Formed Concrete on Busan's Jeollidan-gil
In Busan's Jeonpo-dong, a 454 m² mixed-use block stacks a neighborhood facility, guest rooms and an oval rooftop pool inside spiraling concrete walls.
Similar Reads
You might also enjoy these articles
Vereda Arquitetos Renovates a 40-Square-Meter Apartment Inside Niemeyer's Copan Building
A compact unit in São Paulo's most iconic residential tower gets a material overhaul that pairs exposed concrete with bold blue Formica.
Shakur's House: Exposed Brick as an Interior Organiser in a 168 m² Mashhad Residence
Brick moves indoors in this Mashhad residence, where masonry walls, glass partitions and teal planes sequence a compact home without closing it off.
Day and Night Park: A Time-Based Urban Newsstand in Beijing
A temporary urban newsstand in Beijing blending travel, light, and reading through poetic colors, compact form, and community-focused design.
Modernist Patio Renovation in El Masnou, Barcelona by Oliver Segura Arquitectura + Cebrià Arquitectura
Modernist patio renovation blending tradition and innovation with a movable pool, leveled floors, and Catalan materials in El Masnou.
Explore Mes School Of Architecture Competitions
Discover active competitions in this discipline
The Global Benchmark for Architecture Dissertation Awards
The Global Benchmark for Graduation Excellence
Essay writing competition - Architecture in video games
Competition to design a workstation for architects
Comments (0)
Please login or sign up to add comments
No comments yet. Be the first to comment!