Avellaneda's Municipal Design Offices Turn a Derelict Industrial Shed into an Audiovisual Experimentation Center
In Avellaneda, Argentina, a concrete-framed brick shed becomes a 1,430 m² media school with a sunlit steel stair running through its nave.
Public buildings designed in-house by a municipality rarely get much attention. The Audiovisual Experimentation Center (CEA) in Avellaneda, Argentina, deserves some. It is the work of the Dirección General de Arquitectura, the Secretaria de Planificación and the Municipalidad de Avellaneda, completed in 2026 at 1,430 m². It sits in a part of the city reshaped by redevelopment, close to rail lines and within sight of a football stadium. The archival photographs in the set show what was there before: two derelict brick and concrete sheds in a dirt yard. The new building keeps that industrial grammar and gives it a public use.
What interests us is restraint. The teams did not wrap the shed in a new skin, and they did not empty it out to make a showroom. They kept the concrete portal frames and the brick infill. Then they put a mezzanine structure, a raked auditorium and a black steel stair inside, and opened the ends with tall glazing. The building reads like a working film studio: a long, well-lit volume where new equipment goes into an old frame and the joints between them are left visible.
What Was There Before


The black and white photographs show a yard of mud, a crane and a dog asleep between two sheds. Inside, pallets and drums are stacked along a central aisle under a concrete frame. They work as documentation, and they also set the scale for everything that follows. The column rhythm, the brick walls and the long axis of that abandoned hall are the same bones you see in the finished interiors.
It matters that a municipality chose to keep this structure. Industrial sheds in Greater Buenos Aires are usually cleared without much debate. Keeping one ties the center to the neighborhood's working history and saves the cost and carbon of a new frame.
A Building at the Edge of a Park


From the air, the center reads as a modest long box inside a larger green fragment, with a curved road and a stadium on the horizon. The top-down view shows a flat roof covered in solar panels next to a grassy embankment and a stepped green ramp. The landscape does real work here. The ground is shaped into mounds and steps that people can sit on, so the building's edge opens onto a slope instead of a car park.
The Portal as Civic Front









The main gesture on the street is simple. A concrete portal frame stands free at the end of the building and holds a full-height glass wall behind it. On the long sides, black steel-framed glazing is cut into the brick in tall vertical bays, which makes the old shed look like a series of large windows on the city. In low afternoon sun it is a plain industrial volume with deep openings.
At dusk it changes. The glazed bays glow, the floors show through the end wall, and backlit letters cut into the brick name the building without a sign bolted on. For a center about moving images, presenting the building as a lit screen after dark is fitting, and it was done cheaply. The cyclists and pedestrians in these photographs suggest it already functions as a landmark at street level.
A Nave Crossed by a Stair









The interior is organized around a double-height hall, close to a nave in proportion. A black steel stair zigzags up through it, and white steel mezzanine frames line the edges. Square skylights in the exposed concrete ceiling throw patches of sun onto the floor, and the patches move through the day. Since this is a school for people who work with light and framing, that daily movement of light on the floor becomes part of what the building teaches.
The palette is easy to read. Original concrete and brick are left raw. New structure is either white, for the mezzanines, or black, for the stair. Glass balustrades keep the upper walkways visually light, so the people on them appear in the composition. Red seating appears at a few points and gives the eye somewhere to land. The approach is a tried one, and it suits the space.
Rooms for Screening and Making





The auditorium is the only space that closes in on itself. Raked grey seating, pale timber wall panels and a black ceiling with downlights turn it into a controlled room for watching. Above, the trusses stay exposed, which reminds you that this box was inserted into the shed. You do not forget the original building even when the lights go down.
The workrooms take the opposite approach. Long tables run along full-height glazing that looks onto the grassy slope, under the same concrete ceiling and between brick piers. A ground-floor lounge with red rounded pouffes opens to the lawn. These are flexible, plain rooms, and they will probably age better than more designed interiors would.
Leaving the Past Visible



The details show the most care. One steel column is filled with stacked stones beside an exposed brick wall. A rusted steel beam with curved brackets, which looks like a leftover from the shed's working life, spans above a new glass-walled meeting room. Even in the restrooms, a translucent panel lets the brick show through behind white tile and timber partitions. The old fabric is treated as material to work with, not as damage to hide.
Plans and Drawings








The site plan places the long footprint next to the rail lines, with the stadium nearby and the street grid around it. The exploded axonometric is the clearest account of the strategy. It shows a row of portal frames above, stacked program boxes and a glazed platform below, and the stair winding through the middle. The floor plans arrange the auditorium at one end, open workspace along the column grid and a central core. The sections show how the diagonal stair cuts through the main hall.
Why This Project Matters
Argentina's municipalities build a large share of the country's everyday public architecture, and that work is seldom published or discussed. The CEA shows that an in-house public design team can produce a building that is clear, well lit and specific to its site, without a star architect or an expensive new structure. Most of the hard decisions were about what to keep.
The project also makes a case for programs to choose their buildings. An audiovisual school needs large volumes, controlled light and flexible floors, and an industrial shed already provides all three. Here the existing building supplied the space and the design added only what was needed. That is a model other cities with empty industrial buildings could use.
Audiovisual Experimentation Center by Dirección General de Arquitectura, Secretaria de Planificación and Municipalidad de Avellaneda. Location: Avellaneda, Argentina. Area: 1,430 m². Year: 2026. Photography: Federico Cairoli.
About the Studio
Dirección General de Arquitectura
Share Your Own Work on uni.xyz
If projects like this are the kind of work you want to make, uni.xyz is a place to publish your own, find collaborators, and enter design competitions.
Popular Articles
Popular articles from the community
KAAN Architecten Packs Social Housing and Offices into a Timber Matchbox at the Edge of Eindhoven's Strijp-S
In Eindhoven's former Philips district, a demountable post-and-beam timber block stacks 36 social rentals over offices around a shared garden.
Engagement Through Sculpture: Concrete Shells That Turn a Paris Square Into a Climbable Lookout
A winning Sculpt[r] 2020 entry drapes timber stairs over sloping concrete shells, offering Parisians a climb, a view and shade beneath.
Wave 'Coral': Four Perforated Canopies Bring Human Scale to a Monumental Plaza
A wavy lattice shell repeated four times around an obelisk, turning a vast paved square into pockets of shade, planting and places to sit.
Minqa Atelier Steps a 53 m² Teak Refuge Down a Forested Slope in Ecuador's Chocó
In Pedro Vicente Maldonado, Ecuador, stepped teak platforms on river-stone gabions let a small forest house follow the hillside instead of flattening it.
Similar Reads
You might also enjoy these articles
LAVA Architecten Gives Vocational Education a Sawtooth-Roofed Face on a Mechelen School Campus
In Mechelen, Belgium, a 2,053 m² STEM school on a 6×6 m grid turns workshops and classrooms into rooms that can be rearranged as teaching changes.
KEMA Studio Turns a Derelict Marvila Attic into a 60 m² Lighthouse Apartment Above Lisbon
In Lisbon's Marvila district, a rebuilt roof, four skylights and two plywood volumes turn an unlivable attic into a bright home facing the Tagus.
Pixel Gardens: One Repeated Module Stacked Into a Terraced Social Housing Tower for Famagusta
Salem Bader's shortlisted housing tower builds a vertical neighbourhood from one repeated module, offsetting units to carve terraces, light and air.
Bao Huynh Watercolor Atelier: A Serene Art Retreat in Hội An
Bao Huynh Watercolor Atelier in Hội An blends multifunctional art spaces, sustainable design, local materials, and family-friendly living in a serene environment.
Explore Architecture Competitions
Discover active competitions in this discipline
Submit a world, not a render
Studio work deserves a jury
The International Standard for Design Portfolios
The Global Benchmark for Architecture Dissertation Awards
Comments (0)
Please login or sign up to add comments
No comments yet. Be the first to comment!