DUTS design Reopens Beijing's Olympic-Era Shell Theatre to Its Park by Renewing Only Ten Percent of Its Edges
In Beijing's Chaoyang Park, a 2008 outdoor theatre gains slanted concrete walls and striped terraces that open it to the lake on three sides.
The Shell Theatre sits on the central island of Beijing's Chaoyang Park, a piece of land with water on three sides. It is an outdoor venue from the 2008 Olympic era, with a scalloped steel canopy over the stage and a fan of seating facing it. Like many venues built for a single moment of national display, it aged into something closer to a fenced object than a public place. DUTS design was asked to renew the 14,900 m² site. Instead of a clean slate, the studio proposed what it calls a "10% interface renewal": keep the bulk of what exists and rework only the surfaces where the theatre meets the park, the paths and the water.
That is the interesting part. Most theatre renovations are judged by the stage, the acoustics and the seat count. This one asks to be judged at its perimeter. The canopy stays, the bowl stays, and the design effort goes into a band of slanted white concrete walls, striped paving and grass terraces that decide whether a jogger on a Tuesday afternoon feels invited in or kept out. We think that is the right question for a park venue that is empty far more often than it is full, and the project ties into the wider Liangma River cultural waterfront masterplan, which gives the edge-first strategy a larger urban logic.
Keeping the Canopy, Changing the Ground



The quilted white membrane on its steel truss is the one element everyone remembers, and DUTS leaves it alone. That restraint pays off. With the canopy treated as a fixed landmark, the new work can stay low and horizontal, and the contrast between the scalloped roof and the flat, curving white bands across the lawn reads clearly from the lakefront.
Look at the seating. The bowl now reads as a terraced grass slope traced by white edges rather than as rows of fixed seats. On a non-performance day it works as a lawn people sit on facing the lake; on show nights it still points everyone at the stage. One landform, two programs, and no reconfiguration needed.
What the Studio Inherited


The survey photos are frank: worn paving, a weathered service building, an overgrown seating slope, a ribbed roof that has seen better summers. None of this is structural failure. It is the ordinary decay of a venue with no daily public life, and that diagnosis explains the strategy. If the problem is neglect at the edges, you fix the edges.
The renewed slope keeps the same basic geometry, but people now actually occupy it. The curving white bands give the grass a structure that is easy to read and easy to sit on. That is a small change in fabric with a large change in behavior.
A Wall That Leaks on Purpose






The defining new element is a long, low run of tilted white concrete panels along the plaza and the lakeside path. Each panel leans, and the gaps between them are generous. The result marks a boundary without sealing it. You know you are at the theatre, but you can see the willows and the water through the openings, and you can walk through.
The angles do real work. A vertical wall of the same height would read as a fence; tilted, the panels read as a sequence of planes that catch the low autumn sun and throw changing shadows across the paving. Lettering and a rectangular cutout give the wall a signage role too, so wayfinding and enclosure share one element rather than adding street furniture.
Framing the Trees Instead of Clearing Them



Several of the strongest moments happen where a gap in the wall lines up with an existing tree. A willow trunk rises through a slanted opening; a yellow canopy sits perfectly between two panels with the stage truss behind it. These views suggest the wall layout was set out around the mature planting rather than the other way round.
That is the low-intervention idea at its most convincing. The trees are the park's oldest asset, and the new concrete exists partly to put them on display. A heavier renovation would likely have lost some of them to regrading and services.
Stripes, Steps and the Slope to the Water





The striped paving is a cheap and effective trick. Alternating bands direct movement toward the pond and the stage, and they visually tie the plaza to the white lines on the grass terraces, so hard and soft surfaces read as one ground. Families sitting on the steps in afternoon sun are the evidence that the terraces work as everyday seating.
Where the terraces drop toward a planted pond edge, the stepping slows you down and turns the waterfront into a place to stop rather than a route to pass. It is the edge the original venue seems to have largely turned its back on.
Ramps, Walkways and Service Edges


Accessibility and service are handled in the same language. A concrete ramp runs beside the lawn terraces with the canopy rising behind, and a grey covered walkway with square columns sits next to an open angular frame. These are not glamorous pieces, but they are often where renovations fall apart, and here they stay consistent with the rest of the scheme.
Plans and Drawings
















The site map, with its metro stations, piers and concentric distance rings, frames the theatre as part of a city network. It is not a destination you drive to once a year. The colour-coded site plans separate audience, VIP, market, service and logistics routes, which is exactly the kind of untangling a festival venue needs if it is also going to function as an open park on ordinary days.
The sections and elevations make the scale of the intervention legible: the slanted panels are low, roughly body-scaled against tall trees, with the canopy as the only vertical event. The axonometric sightline and occupancy diagrams show the bowl working for performances, while the waterfront circulation arrows show how much of the design is about getting people around and past the theatre, not just into it.
Why This Project Matters
China has a large inventory of event architecture built for 2008 and the years around it, much of it structurally sound but socially stranded. The default response is often demolition or an expensive rebuild. DUTS design shows a third option: accept the existing structure as given, and spend the budget on the thin layer where a building meets its public. Ten percent is a modest number, and that modesty is the point.
For designers working on any underused civic venue, the lesson is about where to look. The stage is not always the problem. Sometimes it is the fence, the blank service wall, the path that skirts the site without entering it. Rework those interfaces with care, and an Olympic relic can become a lawn where people sit by the lake on a weekday afternoon.
Renovation of Shell Theatre in Beijing Chaoyang Park by DUTS design (lead: Zhong Ling; scheme design: Peng Xu, Feng Zhenduo, Zhang Yan, Yang Linbing; landscape design: Liu Xiaohui, Liu Xiaoxuan). Location: Beijing, China. Area: 14,900 m². Year: 2025. Client: Beijing Kuntai Holding Group Co., Ltd. Photography: Shan-jian images.
About the Studio
Share Your Own Work on uni.xyz
If projects like this are the kind of work you want to make, uni.xyz is a place to publish your own, find collaborators, and enter design competitions.
Popular Articles
Popular articles from the community
Tsunami Convergenics: Turning Catastrophic Ocean Forces into Underwater Housing Infrastructure
A speculative underwater settlement off the coast of Onagawa, Japan, treats tsunamis and typhoons as energy sources rather than threats.
The Amber Palace Opera: A Geological Fiction Surfaces on Tallinn's Baltic Waterfront
Pierre Brillard reimagines a Baltic legend as a public landscape, opera house, and waterfront promenade rooted in Tallinn's coastal identity.
Temporary Home for Dogs: A Reversed Zoo Rethinks Animal Shelter Architecture
In Bucharest, a sinuous corridor and freed landscape flip the logic of containment, designing a shelter that works to make itself unnecessary.
Faces of the Soviet Avant-Garde: Turning Moscow's Street Names into an Open-Air Museum
A network of sculptural installations across a Moscow residential district transforms forgotten architect names into spatial encounters with cultural memor
Similar Reads
You might also enjoy these articles
Pixel Gardens: One Repeated Module Stacked Into a Terraced Social Housing Tower for Famagusta
Salem Bader's shortlisted housing tower builds a vertical neighbourhood from one repeated module, offsetting units to carve terraces, light and air.
Bao Huynh Watercolor Atelier: A Serene Art Retreat in Hội An
Bao Huynh Watercolor Atelier in Hội An blends multifunctional art spaces, sustainable design, local materials, and family-friendly living in a serene environment.
Atelier Macri Concept Store Interior Design by CASE-REAL
Atelier Macri store features a "ko" counter, walnut wood details, cork displays, blending retail, gallery, and seamless customer experiences.
Manuel Vargas Izquierdo Stadium and High-Performance Sports Center: Architectural Excellence in Jalpa de Méndez
The Manuel Vargas Izquierdo Stadium blends sustainable design, inclusive sports facilities, and cultural-inspired architecture, revitalizing Jalpa de Méndez’s public spaces.
Explore Cultural Architecture Competitions
Discover active competitions in this discipline
Challenge to design luxury tourism on rails
VR headsets Storefront design competition
Bring back Drive In's
Designing a staircase for a client
Comments (0)
Please login or sign up to add comments
No comments yet. Be the first to comment!