ARCHWASTE Turns a Shanghai Ground-Floor Unit into an Office That Never Stops Looking Under Construction
A 60 m² unit in a Shanghai residential compound becomes a workplace where scaffold shelving, raw beams and exposed conduits stay in plain view.
Most office fit-outs are judged by how completely they erase the building they sit in. ARCHWASTE takes the opposite position in the Semi-construction Site Office, a 60 m² interior in Shanghai. The studio, with Hou Yutong as lead architect, works inside an irregular ground-floor commercial unit tucked into a residential compound and set slightly back from the street. They leave the awkwardness of that unit in place. Construction traces, exposed structure and everyday services are kept visible on purpose, and the result reads less like a finished office and more like a job site that people happened to move into.
What makes the project worth your attention is not the industrial look, which has been fashionable for two decades. It is the logic underneath. Scaffolding is used as shelving, a scaffold stair serves as circulation, and conduits double as decoration. Together these say the workplace is meant to keep changing, and they make that claim credible because the parts can actually be unclamped and reconfigured. The name tells you this directly: semi-construction, a state the designers have no intention of resolving.
A Storefront That Refuses to Look Polished



The street face sets the tone without shouting. A yellow panel and a pale green canopy are slotted into an existing pink tiled wall, next to a clipped hedge and a neighbor's hanging laundry. ARCHWASTE does not try to beat the residential compound visually. It lets the new entrance borrow the compound's everyday clutter as a backdrop.
Above the canopy, a looping red rebar sculpture fans out to a single point beside the logo, turning a construction material into signage. The black steel door, with its porthole windows and louvered vent, works in a more deadpan register. It looks like the service entrance to a plant room, which is exactly the point.
Getting In the Long Way


The unit is reached through two consecutive narrow corridors, a circuitous approach that a conventional fit-out would apologize for. Here the corridor is treated as a test bed. Four lighting variations of the same white passage show a yellow pipe, a red hose reel and hanging harnesses, closer to the inside of a safety cabinet than to a hallway.
The metal-framed translucent opening cut into grey stucco, with its screws left showing along the edge, captures the attitude in one detail. The incision is honest about being an incision. We find this more convincing than the usual habit of hiding every patch behind a shadow gap.
Starting From What Was Already There


The before photographs explain most of the design decisions. The lower room held a rusted steel mezzanine frame resting on a single column, with scraped walls and sunlight striping a concrete floor. The double-height space had exposed plumbing, an odd mix of round and gridded windows, and a skeletal steel stair frame.
Rather than demolish this into a blank box, ARCHWASTE keeps the irregularities and builds around them. The mezzanine survives in spirit, the windows keep their mismatched shapes, and even the small scaffold tower visible in the before image feels like a preview of the finished interior.
A Ground Floor Organized Around a Concrete Block Stair



The lower level is anchored by a stair made of concrete blocks, the heaviest and most permanent-looking element in the project. It acts as a seat as much as a route. People perch on its treads in front of leafy windows, which gives a 60 m² office an informal gathering spot without spending floor area on a lounge.
Against that mass, the colorful oval table and black folding chair are deliberately light and movable. Exposed steel joists and the mezzanine edge run overhead, so you always read the room as layered: raw shell, inserted structure and loose furniture, each kept distinct.
Vertical Circulation as Temporary Works



A second stair answers the first in a completely different language. Aluminum scaffold stairs with perforated treads and yellow base plates climb past a framed window onto a tree and neighboring facades. The stair could have been lifted straight off a building site, and it reads as removable, which supports the idea of an office that can be rearranged.
The double-height view down to the scaffold shelving shows how much the section does for such a small plan. A concrete beam wrapped in yellow, a steel guardrail and exposed pipes stack up vertically, so the space gains depth from what it reveals overhead rather than from added floor area.
Scaffolding Used as Furniture



The most persuasive move is the storage wall. Galvanized ringlock scaffolding with perforated steel planks holds metal bins of timber offcuts, material samples, tools, boxes and even the copier. Someone climbs a ladder to reach the top tier. This is a working library for a practice that handles physical stuff, not shelving staged for photographs.
Scaffolding is built to be assembled, adjusted and struck, so using it as millwork means the office's capacity can grow or shrink with a spanner. Against the board-marked concrete wall, the zinc-coated bins look less like props and more like inventory.
The Mezzanine Workstation



Upstairs, a long plywood desk with perforated sides and monitor arms runs the length of the mezzanine. Diamond-plate and steel mesh flooring, fluorescent tubes and exposed ducts finish the space. The palette is plain, and the plywood surface is the one warm, hand-scaled material where people actually rest their arms all day.
Black steel shelving hangs from the yellow-wrapped beams above the desk, so storage is suspended rather than placed on the floor. In a room this tight, every hanging bracket buys back floor area, and the brackets themselves become part of the visual vocabulary.
Connections and Services Left in View




The detailing rewards a close look. Black steel brackets with brass bolts clamp directly onto a bare concrete beam, so nothing is drilled or concealed, and the connection reads as reversible. A clamp-mounted work lamp and a steel cup of markers hang from a blue pipe, treating building services as a pegboard.
Electrical controls sit in small plywood boxes with toggle switches fed by red, blue and steel conduits, next to what looks like a yellow pendant hoist control. Color-coding the conduit runs turns the wiring diagram into wall graphics, and it means whoever reconfigures the office later can see exactly where the power goes.
Objects with a Sense of Humor




The project avoids grim industrial pastiche because it keeps cracking jokes. A small white seal figure set in yellow resin serves as a door handle. Cast metal pieces mounted on rods include a rough slab stamped ARCH WASTE. Red rebar rods fan out from a ceiling point under a recessed downlight, reprising the canopy sculpture indoors.
Colorful climbing holds are bolted to steel and plywood walls, including beside the washroom mirror, where one doubles as a grip. These moments are small, but they tell you the raw aesthetic is a sensibility the studio enjoys rather than a cost-cutting default.
Plans and Drawings


The plans show how much program fits into the irregular footprint. The lower level holds an exhibition area, entrance, meeting area, pantry, storage, restroom and two staircases. The upper level reduces almost entirely to one long workspace table, storage and a truss-lined corridor. Separating public and display functions downstairs from focused desk work upstairs is a clear, sensible split for a unit this size.
Why This Project Matters
Small offices in leftover commercial units are among the most common interior commissions in Chinese cities, and they usually end up as generic white boxes that hide the shell's quirks behind gypsum. The Semi-construction Site Office argues for another route: keep the irregular footprint, keep the old frame and stair logic, and use temporary-works components that can be adjusted as the occupants' needs change.
Not every client will want to work under fluorescent tubes beside a ringlock standard, and the aesthetic has obvious limits for longevity and acoustics. Still, the core idea travels well. Design an interior as a kit of reversible parts rather than a finished object, and you get a workplace that can keep evolving long after the photographs are taken. For a 60 m² project, that is a substantial position to take.
Semi-construction Site Office by ARCHWASTE (lead architect Hou Yutong; design team Yang Yuhang), Shanghai, China. Area: 60 m². Completed: 2025. Photography: Cheng Dai.
About the Studio
Share Your Own Work on uni.xyz
If projects like this are the kind of work you want to make, uni.xyz is a place to publish your own, find collaborators, and enter design competitions.
Popular Articles
Popular articles from the community
Madras Spaces Turns a Tight Rural Plot near Tiruchirappalli into an Inward-Looking Courtyard House
A 92 m² farmhouse in V. Thuraiyur, Tamil Nadu, built from load-bearing brick and reclaimed tile, that hides its openness behind a perforated wall.
Vietnam S: Rhymes of the River Built From Upturned Boat Hulls and a Shared Rooftop
Timber-ribbed, hull-shaped pavilions gather around a water courtyard, turning a street market into an authentic, dynamic place to chill out.
Wave 'Coral': Four Perforated Canopies Bring Human Scale to a Monumental Plaza
A wavy lattice shell repeated four times around an obelisk, turning a vast paved square into pockets of shade, planting and places to sit.
Diogo Aguiar Studio Strings Eight Identical Timber Modules Across a Hillside Above Porto
In the Serras do Porto, a prefabricated timber house of identical sloping modules reads as a small mountain range and lets its program grow.
Similar Reads
You might also enjoy these articles
LAVA Architecten Gives Vocational Education a Sawtooth-Roofed Face on a Mechelen School Campus
In Mechelen, Belgium, a 2,053 m² STEM school on a 6×6 m grid turns workshops and classrooms into rooms that can be rearranged as teaching changes.
KEMA Studio Turns a Derelict Marvila Attic into a 60 m² Lighthouse Apartment Above Lisbon
In Lisbon's Marvila district, a rebuilt roof, four skylights and two plywood volumes turn an unlivable attic into a bright home facing the Tagus.
Pixel Gardens: One Repeated Module Stacked Into a Terraced Social Housing Tower for Famagusta
Salem Bader's shortlisted housing tower builds a vertical neighbourhood from one repeated module, offsetting units to carve terraces, light and air.
Bao Huynh Watercolor Atelier: A Serene Art Retreat in Hội An
Bao Huynh Watercolor Atelier in Hội An blends multifunctional art spaces, sustainable design, local materials, and family-friendly living in a serene environment.
Explore Office Building Competitions
Discover active competitions in this discipline
The Global Benchmark for Architecture Dissertation Awards
Competition to design a workstation for architects
Comments (0)
Please login or sign up to add comments
No comments yet. Be the first to comment!