MVA Raises a Ring-Shaped Office Disk on Three Grass Mounds over a Remediated Landfill near Zagreb
In Dubrovčan, northwest of Zagreb, a prestressed concrete slab on V-columns floats above new terrain, hiding production inside the hills it creates.
Most production buildings in fast-growing business zones arrive as sheds: a steel frame, a cladding catalogue, a parking apron. In Dubrovčan, a village northwest of Zagreb where farmland is steadily giving way to small industry, MVA Mikelić Vreš Arhitekti took a different route for the construction company MDK Građevinar. The site was a construction-waste landfill and material depot, a plot of shifting spoil heaps. The architects remediated it and shaped three grassed mounds that follow the natural slope. They then laid a single-storey square office disk across the top, with a circular atrium cut through its centre.
What interests us is the reversal. The messy part of the program (technical rooms, production, shared facilities) goes into the ground the architects made. The clean part, the offices, floats above on two prestressed concrete slabs. The landfill's unstable terrain becomes the building's foundation idea instead of a problem to flatten. The architects call the result "neutral and specific," and across 1,850 m² the phrase holds up better than most project slogans do.
Making Ground Instead of Levelling It



Seen through the fog that often settles on this landscape, the building reads as a horizontal line resting on soft green humps. You struggle to tell where landform ends and architecture begins, and that is the point. The mounds are not decorative berms. They mark out the central space and the pedestrian approaches, and they hold real program inside.
The move also suits the context. The neighbouring plots are filling up with new commercial buildings that offer little to respond to. MVA sidesteps the problem by building its own topography, giving the project a context it controls while keeping a tie to the rural ground it replaces.
A Disk on V-Columns



The structural logic is easy to read from outside. Two large prestressed slabs form floor and roof, and peripheral V-shaped columns stitch them together along the glazed edge. Four reinforced concrete cores and loose clusters of inclined columns carry the rest. The diagonals give a long, low elevation the rhythm it needs without resorting to fins or screens.
The cylindrical drum on the roof breaks the horizontal just enough to mark the building from a distance. It is the top of the vertical route that runs up from the atrium, and it signals that the roof is meant to be used.
The Glass Edge After Dark


At dusk the slab edge turns into a lit band, and the cantilever over the mounds becomes the strongest gesture on the site. The corner view shows how far the upper plate overhangs its base. Here the slab-and-core system earns its keep: long spans that make the cantilever look effortless rather than strained.
The Atrium as Hollow Centre



Cutting a circle out of a square plan is an old trick, but here it does several jobs at once. It brings daylight to the middle of a deep floor plate. It gives the offices an inward-facing view of planting and stairs. It also opens a sunken court that connects to the lower level through a concrete underpass. Walking in under the slab and arriving in a round green room is the project's best spatial sequence.
The curved glass ring around the court keeps the working floor visually tied to the landscape below it. Night views show the office level hovering over the planted hollow like a lantern set into a crater.
Routes Through the Landscape


Lifting the building lets pedestrian paths and planting run underneath and between the mounds. Curving concrete walkways and benches thread between freshly planted slopes, with irrigation lines still visible. The landscape is clearly still growing in. MVA also handled the landscape design, which explains why the ground plane feels like part of the architecture rather than something applied afterwards.
A Ring of Flexible Workspace



Inside, closed offices line the outer façade, meeting rooms take the corners, and the ring around the atrium holds reception, hot desks and circulation. Because no interior walls carry load, the partitions are lightweight and demountable. For a client in the construction business, building in that kind of future renovation is a sensible bet.
The material palette is restrained: board-marked concrete, terrazzo, plywood, sheer curtains. Red pendants and a stainless steel reception desk at the foot of a forked column add warmth and a little theatre. The inclined columns stay visible throughout, so you never lose track of the structure holding up the roof.
Rooms for Gathering



The collective rooms carry the most personality. Timber stepped seating under a curved window wall forms a small auditorium. A sunken pit lined with red shag carpet sits inside a board-formed concrete drum. A glazed end room holds a meeting table framed by diagonal struts. These spaces suggest a company that expects its staff to present, argue and linger, not just work at desks.
The auditorium also opens toward a multifunctional common space and an outdoor terrace at the lower level. That link turns the gathering spaces into a vertical sequence rather than isolated rooms.
Spiralling Up to the Roof


A black steel spiral stair rises from the atrium to a rooftop pavilion, a terrace and a running track. Mesh guards keep the stair and the stair void light against the heavy concrete. A running track on top of a production building is a small luxury, but it completes the logic of the section: ground for making, middle for working, roof for everyone.
Plans and Drawings






The exploded axonometric explains the project better than any photograph. It shows a roof plate with a red track and circular openings, a ring-shaped floor, and black volumes sunk into the terrain. The plans confirm the clear split between the lower level, where rooms and a café sit among curving landscaped ramps, and the upper floor of perimeter offices around the void. The sections show how the slope, the basement and the rooftop drum line up on one vertical axis.
Why This Project Matters
Croatia's periurban edges, like those of most European cities, are filling with industrial and commercial buildings that treat land as a flat surface to pave. Dubrovčan shows another option. You can remediate a degraded site, rebuild its topography and use that new ground to absorb the least photogenic parts of a program. Doing so costs effort in the earthworks and in the structure, but it gives the building a landscape role that a standard shed never could.
The project also makes a quiet case for structural generosity in workplace design. Long prestressed spans, a few cores and demountable partitions mean the plan can change as the company changes. That kind of long life rarely makes headlines, and it is exactly what a construction firm's own headquarters should demonstrate.
Production and Office Building Dubrovčan by MVA Mikelić Vreš Arhitekti, Dubrovčan, Croatia. Area: 1,850 m². Completed: 2024. Photography by Jure Živković.
About the Studio
Share Your Own Work on uni.xyz
If projects like this are the kind of work you want to make, uni.xyz is a place to publish your own, find collaborators, and enter design competitions.
Popular Articles
Popular articles from the community
Extended Shell: Retrofitting Kolkata's Balconies as Living Urban Thresholds
A modular retrofit system recovers the social and environmental intelligence of Kolkata's historic verandas for contemporary Park Street residents.
The Amber Palace Opera: A Geological Fiction Surfaces on Tallinn's Baltic Waterfront
Pierre Brillard reimagines a Baltic legend as a public landscape, opera house, and waterfront promenade rooted in Tallinn's coastal identity.
Opera by the Sea Estonia: Three Shells Dissolving Architecture into Tallinn's Coastline
A winning opera house proposal replaces monumental form with interconnected shells that blur the boundary between building, park and Baltic Sea.
Temporary Home for Dogs: A Reversed Zoo Rethinks Animal Shelter Architecture
In Bucharest, a sinuous corridor and freed landscape flip the logic of containment, designing a shelter that works to make itself unnecessary.
Similar Reads
You might also enjoy these articles
Pixel Gardens: One Repeated Module Stacked Into a Terraced Social Housing Tower for Famagusta
Salem Bader's shortlisted housing tower builds a vertical neighbourhood from one repeated module, offsetting units to carve terraces, light and air.
Bao Huynh Watercolor Atelier: A Serene Art Retreat in Hội An
Bao Huynh Watercolor Atelier in Hội An blends multifunctional art spaces, sustainable design, local materials, and family-friendly living in a serene environment.
Atelier Macri Concept Store Interior Design by CASE-REAL
Atelier Macri store features a "ko" counter, walnut wood details, cork displays, blending retail, gallery, and seamless customer experiences.
Manuel Vargas Izquierdo Stadium and High-Performance Sports Center: Architectural Excellence in Jalpa de Méndez
The Manuel Vargas Izquierdo Stadium blends sustainable design, inclusive sports facilities, and cultural-inspired architecture, revitalizing Jalpa de Méndez’s public spaces.
Explore Office Building Competitions
Discover active competitions in this discipline
Challenge to design a portable theatre
Challenge to design a portable music platform
Challenge to design an open learning module for the elderly
Comments (0)
Please login or sign up to add comments
No comments yet. Be the first to comment!