Moving Walkway coverMoving Walkway cover
Moving WalkwayMoving Walkway

Moving Walkway

Architectural and urban design approaches to pedestrian movement, circulation systems, and connective spaces.

15 Projects 8 Journals 4 Publications 1 → 0: 1: 0: 1: 1: 0: 0: 1: 1: 1: 0: 0: 0
liked
irem08

MOTION

This project explores well being through movement. A continuous loop guides users through shifting spatial conditions, connecting public and introspective spaces. By integrating the urban ground and elevating parts of the path, movement becomes a tool for mental clarity and spatial experience.

MOTIONMOTION
29
and saved
ethan82

The City Link

This proposal is trying to creating a unique waterfront cycling and walking experience. The bottom part is designed to extreme water-enjoyable-space with floating landscape. While the upper part is a skywalk with many recreational function, as well as a ViewPoint with unique scene, of whi

Silvia Rizzo
Juror

The study of functional and constructive detail is good, although the architectural result is not very innovative.

0
281
and saved
a.alvearperez
vineethingorani
alan

The Green Link

The development of an urban park above railway lines creates accessible and usable green public spaces providing an enhanced experience for daily commuters & casual visitors. The design suggests a renewed system of transport, allowing one to walk, cycle & use the train, generating a balance between private & public modes reducing congestion and overcrowding.

197
saved
zillur

Transitional Linkage

Concept of this project came from the site. Studying the site it was found that there is an invisible path going through the rail line and crossing the highway. That path was created because of peoples need. So I try to formalize that path in my project for the ease of movement of local pedestrian. Those paths become my concept of central space of my project

32
and saved
aafrin

Commercial Bridge - An urban connect

The project intends to solve the issue of dispersion of the two commercial hubs of Bangalore by proposing a bridge as an active connection,becoming an extension of the commercial centers at its end to form a single commercial hub, also promoting pedestrian activity. A prototype for activity bridge is created- a solution for scarcity of vacant land in future.

36
saved
nidhimehra526
simikumarichaurasia
rutuja04

THE SILA : CONNECTING THE CITY

THIS PROJECTS CONNECTS ALL THE MODES OF COMMUTE FOR THE BETTERMENT OF PEOPLE IN 2030.THE INCREASING POPULATION OF MUMBAI IS THE MAJOR PROBLEM, TO FACE IT WE CAN DESIGN AN APPROACH TO OVERCOME A BASIC NEED FOR COMMUTE.THE DESIGN INCLUDES THE CURRENT NETWORK WITH MODIFICATION AND FEW OF THE FUTURE PROJECTS THAT WILL TAKE PLACE IN THE NEAR FUTURE.

19
and saved
sakshi478
jatin591

BHARAT BHAWAN

The proposal for new age Bharat Bhawan is a medium to connect today?s generation to its long-lost cultural heritage. It is a reflection and amalgamation of the art, architecture and culture of the city over a period of time.

197
saved
abhi30794
dimple58
sonal85

Bridging Work

Office and workspaces need not be a space surrounded by four walls nor does it have to be a place acclaimed by an authority. Workspaces in the coming decades would be simply the right environment to enhance your skills and a place used by working individuals striving to achieve a goal.

30
salysaif

loop park project

A 300-vehicle capacity parking lot design is requested for the project area located in the Syracuse district of New York, USA. The project area is 2583.29 m2 and the ground cover of the area is 40%. The maximum height can be 120 meters. The base area of the structure is 1033.00 m2. There are 4 human, 2 vehicle elevators, 2 male, 2 female, 2 disabled toilets on each floor. The thin and long structure of the project area created difficulties in ramp solutions. In order to solve this problem, ramps were extended along the two long facades of the structure. Access to two floors can be provided with one of these ramps. The parking lot consists of 2 basements, ground floor, and 19 floors. Although the number of vehicles on the floors varies, there are an average of 16 vehicles. Vehicle maintenance, washing and storage are available at -7.80 level. -3.80 level is reserved for van-style vehicles. There are social activity areas at +24.30 and +48.80 levels. There is a cafe restaurant at +69.80 roof level. Social areas on the intermediate floors were blocking the ramp circulation, my ramps providing access to two floors made this problem easier to solve. One arm of the ramps is cut off because it will not provide access to the floors where there are activities. The ramp starting from the floor below the activity area provides access to the two upper floors and eliminates the problem. Ramps create a beautiful effect on the facade of the building.

loop park projectloop park project
6