Post-Earthquake Reconstruction coverPost-Earthquake Reconstruction cover
Post-Earthquake ReconstructionPost-Earthquake Reconstruction

Post-Earthquake Reconstruction

Architectural and urban design responses to earthquake damage, from shelter design to community rebuilding.

17 Projects 6 Journals 2 Publications 0 → 0: 0: 0: 1: 1: 0: 0: 0: 1: 2: 0: 0: 0
and saved
safiyeh
sepehr8
mitra802

Revival Park

Revival park has been designed by the inspiration of old famous gardens of Bagh-Shomal. It includes temporary shelters for earthquake victims which uses indigenous materials and Techniques of old houses and nomadic tents of the region. The purpose of the project is to revive the favorable sense of the site and people existed in the past tense.

Nik Shadw

😍😍😍😍😍

24
Arsham Mad

Good

23
mansure jalali

very good

23
164
saved
minga
Jorge Arvizu Soto
Juror

From an extraordinary concept that solves the removal of rubble and the need for housing, it fell short in the following design stages

1
11
and saved
huxinyue

The Indomitable Persian Blossom

The design is inspired by the indomitable ‘Persian Blossom’, and focuses on the spiritual connotation of the transition from temporary emergency housing to permanent reconstruction, so as to meet the needs for continuity and sustainable development of the local culture of the designate site.

Hu Xin yue
Project Owner

Thanks! Hope you like it💖~

1
xueying zhang

Wonderful design! Considering the local character of the disaster, humanitarian concerns are strong!

1
雅洁 秦

Great design!I like it!

0
121
saved
S.harpreet

PREF_SHELTER

A PRECAST MODULAR CONSTRUCTION SYSTEM DESIGNED WHILE KEEPING IN MIND THE AVAILABILITY OF RESOURCES IN A POST FLOOD SCENARIO KERALA. THE PROJECT FOCUSES ON RESOLVING THE MODULAR COMPONENTS, TRUSTING THAT THE OUTCOME OF WHAT CAN BE BUILT OFF THESE COMPONENTS WOULD BE SUITABLE TO MANY A FLOOD PRONE AREAS.

38
saved
amit56

Man, Material and Manifestation - Reconstructing Majhi Gaun, Nepal. Earthquake Resistant Non-Engineered Houses.

Earthquake that occurred on 25th April 2015 in Nepal. This resulted in about 8 lakh people living without a roof over their heads. Today the situation remains unchanged. The intention is to demonstrate reconstruction of MajhiGaun with the help of local people, available appropriate material and earthquake resistant techniques of non-engineered houses.

72
and saved
kacper20
marta491

Immediate post-disaster architectural response

Project is directed for places affected by natural disasters and war damages, in which infrastructure destruction has occured that prevents normal functioning without a far-reaching reconstruction process. Its task is to replace parts of the destroyed infrastructure and allow the local community to return to everyday life as quickly as possible.

299
and liked
muhammad636

Resiliencity

this project demonstrate a new technique of ubranism

Jorge Arvizu Soto
Juror

I really liked how he cared about the easy and fast construction as well as the structuring for earthquakes

0
20
congcong

Rebirth Land

Haiti has experienced several environmental, human, and political disasters due to its geographical location. The concept of my design is rebirth, my pavilion was created to help people move from despair to optimism. I hope people whose lives were wrecked by the earthquake could rediscover the courage and fortitude that was once within their hearts.

Rebirth LandRebirth Land
16
and commented on
basia88

reborn.

Basia M
Project Owner

Thank You for the feedback!

0
Jorge Arvizu Soto
Juror

In general, it is a very good proposal, but being an ideas contest I think that the idea was lacking

0
34